Basic Info.
After-sales Service
1 Year
Type
Piston Filling Machine
Filling Valve Head
6 Heads
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Pressure
Packaging Container Lifting Structure
Pneumatic Lifting
Packaging Material
Plastic
PLC & Touch Screen
Siemens
Delivery Time
45days After Get Deposit
Aftersale Service
Engineer Able to Go Abroad for Commissioning
Product Description
Mouthwash Filling Capping Machine Line With Cap Vibratory Bowl
Features:1. The flow control devices of each filling head are independent of each other, precision adjustment is very convenient.
2. The material of the machine material contact part can use the food grade material according to the products feature, in line with the GMP standard.
3. With regular filling, no bottle no filling, filling quantity/production counting function etc features.
4. Convenient maintenance,no need any special tools.
5. Using drip tight filling head,no leaking.
6. Photoelectric Sensor, Mechatronics Filling Adjustment System,Material Level Control Feeding System
7.Stainless Steel Frame,Plexiglass as Security Cover
8. Control System: PLC/Electronic-Pneumatic Controlled
9. Capaity Adjustment:All cylinders adjusted automatically combine single cylinder adjusted individually.
Tenical Parameters:
Output power | 2000W |
Voltage | AC220V/380,50/60HZ |
Machine weight | 800kg |
Productive Capacity | 1000-6000 BPH (customized) |
Machine size | 2500*1400*1800mm |
Filling Range | 50-1000ml (Customer made available) |
Control Style | PLC control |
Time adjust | electronic adjust |
Packaging | wooden case packaging |
About UsService Term1. InstallationThe initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled. While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days excluding travel days. The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below. When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals. 2. TranslatorIf translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.Commercial Terms1. WarrantyAll parts are under One Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company. 2. Payment30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.We also accept L/C payment, 30% down payment, and 70% L/C at sight
RFQ: Q:What are you main products?
A:Guangzhou Guanyu Machinery Co., Ltd. is a 23-year-old manufacturer specializing in the production of beverage filling machinery and equipment. We have been certificated by the famous cercification authority.
Q:How can I install my machine when it arrives?
A:We will send the engineers to install and test the machines and have training lessons abroad, but the Visa fee, round tickets, accommodation, eating, and the allowance of 80USD per day per person will be on customer's side.
Or the customer can send the engineer to our company to complete the inspection of the goods, as well as the installation and training lessons ,but the Visa fee, round tickets, accommodation, eating, and the allowance will be paid by customers .
Q:What's your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 2 years guarantee . we will give u free spare parts in 2 years.
If during the warranty period, the quality or specification of the goods is found to be inconsistent with the contractual requirements, or if the goods are found to be defective (including potential defects or the use of unqualified materials, etc.), the buyer has the right to use the inspection documents issued by the statutory authority. During the warranty period of the goods, the buyer shall make a claim against the seller.
Q:Where is your company located ?How can i visit there?
A:Our factory is located in Baitang taihe town,Guangzhou City,Guangdong Province,China.
You can fly to Guangzhou International Airport and we are warmly welcome to visit us.(Provide pick-up service.)
Q:How can l get some samples?
A:We have no sample.we will send you more pictures and video about this machine,and welcome to visit our factory to see the machine running in the factory.
Q:How about the quality of your products.
A:Our company guarantees that the products provided are brand new, unused, with the latest design and suitable materials, and comply with the quality, specification and performance of the contract in all respects.
Q:What's the delivery time?
A:7-45 days after the T/T deposit or L/C.(The premise is to receive customer's samples and deposit).
Q:What about Product's material and configuration use?
A:304 stainless steel, the machine frame material is iron. According to customer requirements, 316 stainless steel is available , complete machine stainless steel, and customers demand specified configuration.
Address:
No 6, Songyuan Street, Botang, Longgui, Guangzhou, Guangdong, China
Business Type:
Manufacturer/Factory, Trading Company
Business Range:
Agriculture & Food, Industrial Equipment & Components, Light Industry & Daily Use, Manufacturing & Processing Machinery, Metallurgy, Mineral & Energy, Packaging & Printing, Sporting Goods & Recreation
Management System Certification:
ISO 9001, QC 080000
Company Introduction:
Guangzhou Guanyu Machinery Co., Ltd. Was established in 1997. It devotes in the development, Manufacture and installation of the foodstuff, chemical, cosmetic and he pharmaceutical facility and equipment, water treatment equipment and so on. With the advanced technology, production and inspection equipment, and the specialized processes. We have been a professional equipment manufacturer and provided kinds of the equipment based on the market requirement.
Guangzhou Guanyu Co., Ltd Works has earned a good reputation and trust from clients for timely delivery, reliable quality and good after-sales service. We keep a firm principle of abiding by contracts and quality first" Meanwhile, we always take clients as our top concern and strive to serve them well.
For satisfying the domestic and international customers, we adhere to our principle "Quality the first, Technology leading, social and environment care and continuous development " to meet the criteria of the ISO9001 and good after- has owned us a good reputation in the industry and firmed business relationship and friendship with all our customers.
We warmly welcome the customers at home and abroad to visit our company and choose our products!